Completed Projects


>> NEOM BAY AIRPORT UPGRADE' *00369* TABOUK, KINGDOM OF SAUDI ARABIA

Neom Bay Airport, which will serve Saudi Arabia's $500bn (SAR1.9tn) cross-border futuristic Neom city in Tabuk Province. Architect: Design & Built


>> KAUST General Construction Services, Saudi Arabian Oil Company ("SAUDI ARAMCO") Town Center & Campus Upgrade (Pckg 2)

King Abdullah University of Science and Technology General Construction Services. Work Demolish, design, supply & install all kind of facilities including structural repair, architectural works and MEP works for total of 4 buildings rectification, No of Buildings: 4 Buildings, Buildup Area: 3,645.90 M2, Floor Area: 15,840.82 M2


>> KAUST General Construction Services, Saudi Arabian Oil Company ("SAUDI ARAMCO") Town Center & Campus Upgrade (Pckg 2)

King Abdullah University of Science and Technology General Construction Services. Work Demolish, design, supply & install all kind of facilities including structural repair, architectural works and MEP works for total of 4 buildings rectification, No of Buildings: 4 Buildings, Buildup Area: 3,645.90 M2, Floor Area: 15,840.82 M2


>> Water Injection Pump Stations (WIPS) Facilities, Saudi Arabia, Subcontract : 084255-000-SC5900-002 A1, Saudi Arabian Oil Company

Construction of civil, structural, architectural, electrical, instrumentation, communication, HVAC and plumbing works related to the WIPS equipment foundation work, substations, control building, UPS building, battery rooms, structural steel equipment supply and pipe racks, evaporation pad, underground RTR piping, demolition work, paving & roadwork's.


>> Bin Jumah Movenpick Hotel Mansour Binjuma Trading

This project consists of a 14 storey Five Star Hotel Building, largest Banquette Hall building in the eastern province, Seven storey Employees building and six number two storey Guest Villas. The major works consist of: Civil, Architectural, Electro-Mechanical and Interior Design Works including all furniture's and equipment


>> Saudi Kayan Petrochemical Complex , Civil Works at Shipping Gates Contract No. 700-K-060-IK

CIVIL, ELECTRO-MECHANICAL AND SECURITY works at KAYAN Main Gate and Shipping Gate including all industrial civil works related to Hydraulic Barriers, Turnstiles, Security Building, X-Ray Building and SSD-1 Fence, earthworks, duct banks, culverts, asphalt works etc. Modification of Royal Commission Tareeg 184 inclusive of all deceleration and acceleration lanes.


>> Bin Khaldoon Plaza – Dammam Olayan Real Estate Co.

Construction of New Shopping Mall with Ground and Mezzanine floor (area 21,600m²) including Azizia Panda Market and 13 shops, central block, food court (3,675m²), arcade (3,121m²) 2000m² of storage area, loading docks, water tank, including steel space frame and aluminum skylights. External works includes 32,622m² parking area including landscaping, hardscaping and roads.


>> Khursaniyah Permanent Communications, Civil and Facilities Project, Saudi ARAMCO /ABB

This project consists of Civil, electro-mechanical and security access system Construction for Khursaniyah Gas Plant/ Process Facilities (KGP/KPF)


>> Bin Khaldoon Plaza – Phase II - Dammam—Olayan Real Estate Co.

The project Phase II as Zone 4 to New Bin Khaldoun Plaza with an area of 17,700m2 comprise of two storied building, including shops, arcade (1000m²) with aluminum skylights and food court, composed of precast elements on super structure and cast-in-place on sub-structure. The project includes 4 escalators and 2 passenger elevator External works includes parking area, landscaping, hardscaping, and compound wall and asphalt roads.


>> "Ansari Compound" Al-Khobar Mr. Abdulrazak M. Al Ansari

The project "Al Ansari Compound" consists of 52 Villas, 16 Apartment building, Community Center, Staff Accommodation and Guard House, Parking area, landscaping, hardscaping and roads


>> Commissary Building Munirah Camp Reconfiguration Contract# 6600009967 Saudi ARAMCO

Demolition of the security gate to Al Munirah Camp, commissary building # 142 and other incidental buildings and recreational facilities, construction of commissary building, construction of a commissary building, security gate house and underpass tunnel beneath Dhahran boulevard, electrical and non-electrical utilities, tennis & basketball courts & associated site works.


>> BGP Administration Building Berri Contract Requisition No. 3000026286 Saudi Arabian Oil Company

Construction of BGP Administration Building in Jubail, covering enclosed area of 3500 m2 (First and Second floor), including construction of helipad. The project scope will be Hardscape and Landscape Works, Concrete and Precast Works, Steel Structural Framing and decking, gypsum board partition, Furniture's, Audio Visual Equipments, and Electro-Mechanical Works.


>> Al Gosaibi Housing Compound Mr. Salah Khalifa Al Gosaibi K.A. ALGOSAIBI CONTRACTING

The project "Al Gosaibi Compound" has a total area of 58,000m2 includes 100 Bachelor units (5,550m²),66 Family units (9,075m²), Club House & Recreation area (3,175 m²) and Parking area, landscaping, hardscaping and roads (40,000m2) The Recreation Area is comprised of a Swimming Pool with an area of 185m², tennis court with an area of 731m², Children Playground, Kiosk, and Shower Change Room


>> Midal Cables Plant, Aluminum Conductor Manufacturing Plant – Dammam 2nd Industrial City, Kingdom of Saudi Arabia

Midal Bahrain has awarded their new project to set up an Aluminum & Aluminum Alloy wire & conductor factory – Midal Cables Saudi Arabia LLC located at Modon Industrial park, Dammam, Saudi Arabia with the capacity of over 15,000 MT. to Sariya Contracting Company. The construction for the plant has commenced at site. The facility is expected to be operational early May 2014. This facility is being set up using the latest equipment and technology available in this business. Midal Saudi Arabia caters to the local and regional markets meeting their specific requirements. Project component: An industrial facility composed of a Production area of 7300 sqm, administration area of 800sqm, Guard rooms, SCECO and miscellaneous site facilities.


>> Civil and Building Works for Production Line No. 3—Qassim Cement Company

This project consists of Civil, electro-mechanical works for Civil & Building works for Production Line #3


>> Sheikh Babtain Villa Sh. Abdul Wahab S. Al-Babtain

5000m² Private Residential Villa


>> Saudi Aramco Integrated Security Upgrade Program (SAISUP)

Installation of pre-cast concrete foundation including all required earthworks and sundry work, construction of cast In Situ concrete foundation including installation of other pre-cast elements, trenching, cable laying, wire pulling, conduiting, dust banks and related earth/site work, electrical termination, plumbing installation and testing and commissioning and installation of perimeter Saudi Aramco SSD-1 fence.


>> Novotel (Buildex) Hotel, Dammam Saudi Arabia

Consist of Demolition and Dismantling Works, Concrete Work: Lean Concrete, Reinforced Concrete Water Tank (Below basement), Reinforced Concrete Service Stair Structure, Reinforced Concrete Elevator Shaft Structure, Masonry Work: Concrete Hollow Blocks, Siporex Blocks, Thermal & Moisture Protection: Water Proofing System (Wet Areas), Water Tank Tanking System, Finishing works: Concrete Screed (Plain & Reinforced), Ceramic Floor Tiles, Sand Cement Plaster, Vitonite Plaster for Siporex Blocks, Painting (Non-Decorative), Ceramic Wall Tiles, Granite Cladding (Elevator Wall), Gypsum Board Ceiling, Specialties: Toilet and Bath Accessories, Sanitary Fixtures and Mechanical (Plumbing & Fire Protection): Sweet and Raw Water (Pumped) System, Forced (Pumped) Sewer System, Plumbing Fixtures, Fire Sprinkler System, Fire Hose Cabinets and Portable Fire Extinguishers, Related Rough-ins, Civil and Builder's Work


>> RasTanura Integrated Project (RTIP) – Data Center for Sadara (AD-07) Project No. 1-14-3980/4099

One Story Reinforced Concrete Building size 40.00 m. x 47.00 m. (floor Area = 1,880 m2) to be constructed to House and Support Data, Telecommunications, Generator Building 12x9 in size 108m2 and Computing Services and Facilities at the Ras Tanura Integrated Project (RTIP) located at Jubail in Saudi Arabia.


>> Sheraton Dammam Health Club SPA, Dammam, Saudi Arabia

Sheraton Dammam Hotel & Towers, Renovation of SPA works: Civil, interior and electro-mechanical works * Preliminaries, earth excavation, concrete works, block wall, and brick wall works, waterproofing and insulation work, glazing works, swimming pool works landscaping, electrical work, plumbing work, HVAC work, Supply and fixings of sanitary fixtures and accessories, fixing of light fixtures (supply of any light fixtures by DHCL, wall surface preparation and painting, ceiling preparation and painting, installation of gypsum false ceiling, installation of MDF false ceiling, installation of gypsum partitions, Marble & flooring and carpet flooring.


>> PERIMETER STREET LIGHTING: American Consulate Regional Procurement and Support Office Joachim -Becher-Str. 19—Perimeter & Interior Lighting

Construction of New Perimeter & Interior Lighting to the American Consulate Inclusive of Total up Grade of Security System to Meet New FBO Standards.


>> New Banquet Hall Extension, External Civil & Landscaping Works at Sheraton Hotels

The project includes demolition of existing asphalt and parking shades, construction of New Banquet Hall Extension and External Civil and Landscaping, hardscaping, and asphalt works.


>> Zahid La-Promenade Zahid Real Estate Co., Ltd.

Construction of New Commercial Complex "La Promenade" and an annex building for Zahid Trading & Real Estate Co. Ltd. at Dhahran street. Structure of the building is composed of both cast-in-place and precast elements


Khursaniyah Gas Plant/ Process Facilities (KGP/KPF) Khursaniyah Civil Construction Works KGP/17.205/CW-00

Complete execution of construction works for civil including supply of required materials, labor and supervision to site CCC will supply concrete & rebars hence quote for labor only, but as an option quote for supply and install.


US Embassy Bahrain Physical Security Upgrade Contract # SGE500-08-C-0057 Manama, Bahrain

This project consists of Design-build delivery of Physical Security Upgrade to the existing U. S. Embassy Compound in Manama, Bahrain.


New A/C Warehouse, Utmaniyah Store Yard Req. No. 3000051183, Contract # 6600009862 Saudi ARAMCO

Construction of the new Pre-engineered Steel air-conditioned warehouse bldg. & associated utilities in Uthmaniyah store yard. 1. Structural steel frame with fully insulated cladding. 2. Electrical system & lighting 3. HVAC, Plumbing & Fire protection/ Detection System. 4. Pallet Racking & Shelving 5. Associated Electrical & Non-Electrical Utilities. 6. Site Development Works.


FAHAD ALI REZA MOSQUE AND SCHOOL PROJECT HADDA, Al Khobar

This project consists of Structural, Architectural, electro-mechanical works for the mosque and two-story school.


COMPOUND ACCESS CONTROL American Consulate General Regional Procurement and Support Office Joachim -Becher-Str. 19 Compound Access Control

Construction of New Access to the American Consulate in Dhahran Inclusive of Total up Grade of Security System to Meet New FBO Standards


FAÇADE EXTERIOR HARD LINE American Consulate General Regional Procurement and Support Office Joachim -Becher-Str. 19 Façade Exterior Hard-line

Construction of New Façade Exterior Hard-line to the American Consulate Inclusive of Total up Grade of Security System to Meet New FBO Standards


AL KUHAIMI VILLA PROJECT

Dismantle and relocate the entire pre-engineered structural steel building including all architectural, electro-mechanical, and external works.


Mahmoud Al Kuhaimi Villa, Rakkah

Construction of new villa including all architectural, structural and electro-mechanical, and external works


US Embassy Riyadh Physical Security Upgrade Contract # SSA700-11-C-0001 Riyadh

This project consists of Physical Security Upgrade to the existing U. S. Embassy in Riyadh, including installation of THREE (3) DELTA BARRIER SYSTEM inclusive of all Civil, electro-mechanical, and security works


Construction of Forklift Re-Charging Facility, Dhahran Storehouse, Contract # 660010320 Saudi ARAMCO

The new forklift Building will be constructed with a pre-engineered steel structure with insulated aluminum roof and side cladding the foundation is isolated footing with slab on grade. Electrical and non-electrical utilities with site restoration/development work.


>> Saudi Aramco Integrated Security Upgrade

Location of Work: Uthmaniyah, Shedgum and Hawiyah
Period: 15 June 2011 to 11 December 2011 plus 12 month

Scope of Work: Installation of pre-cast concrete foundation including all required earthworks and sundry work, construction of cast In Situ concrete foundation including installation of other pre-cast elements, trenching, cable laying, wire pulling, conduiting, dust banks and related earth/site work, electrical termination, plumbing installation and testing and commissioning.





Read also:
Clients
Current Projects